Epstein Index›Documents›EFTA00584284
💨IMPACT LEVEL 1 — MEH

Epstein File EFTA00584284: Bedroom, Hanging and Controlled (DS9)

General DocumentDate unavailableEFTA005842841 keyword hits
0
views
0
shares
0
reactions
0
persons
5
keywords
4
excerpts

This document is a daily maintenance report dated June 10, 2013, for the property at 9 East 71st Street detailing HVAC work in the master bedroom, including an air balance review and consultation with A.D. Winston to improve air flow. The report also references plans to hire an art hanging company or carpenter to build frames around silk screens to conceal electrical installations, and notes that a cello was moved to fifth-floor art storage for better temperature control compared to basement storage.

👤 Named in This Document
No named persons linked yet

📋 Key Excerpts4

PersonKeyword
Excerpt 1
9 East 71st street daily report 6/10/13 Master **Bedroom** ac unit review of blue print duct lay out, contacted A.D Winston to help with a solution to increase
Excerpt 2
air flow in master **bedroom** after the air balance report.
Excerpt 3
I will also have to bring art **hanging** company or carpenter to give a proposal to build new frame around the silk screens to hide the electrical installation

Discussion

Let the world know how you feel.

What you just read should make you angry. Channel that into 17 syllables. Our AI helps you craft a haiku in seconds — then share it with the world.

Power hides in dark But sunlight finds every crack Truth cannot be bought

— Sarah K., after reading this document
✍️ Write Your Haiku

Haikus for Humanity — 5 · 7 · 5

React
Share𝕏🦋FBinFund Accountability