Epstein Index›Documents›EFTA00794893
💨IMPACT LEVEL 1 — MEH

Epstein File EFTA00794893: Renovation and Underground (DS9)

General DocumentDate unavailableEFTA007948931 keyword hits
0
views
0
shares
0
reactions
0
persons
3
keywords
4
excerpts

This document contains a detailed renovation budget and construction checklist for an underground project. It specifies that the initial renovation budget was increased to cover building repairs, new concrete floors, and accelerated delivery. The checklist includes items such as underground piping inspection, core drilling, vertical stacks, and horizontal branch installations.

👤 Named in This Document
No named persons linked yet
🔑 Evidence Keywords

📋 Key Excerpts4

PersonKeyword
Excerpt 1
In summary, the initial budget for the **renovation** has been upsized to allow for the repair of the building, new concrete floors, and the accelerated delivery
Excerpt 2
PIPING X X X X X 32 SPECIAL ROUGH **UNDERGROUND** INSPECTION X 33 CORE DRILLING AND RUNNING VERTICAL STACKS THROUGHOUT X X X X X X X X X X 34 HORIZONTAL BRANCH
Excerpt 3
FOR RECORD 27 APPROVED SHOP DRAWINGS 28 DUCT FABRICATION AOR APPROVAL OF LAYOUT 29 INSTALL DUCTWORK 30 INSTALL TEMP HEAT PLUMBING 31 COMPLETE CELLAR **UNDERGROUND**

Discussion

Let the world know how you feel.

What you just read should make you angry. Channel that into 17 syllables. Our AI helps you craft a haiku in seconds — then share it with the world.

Power hides in dark But sunlight finds every crack Truth cannot be bought

— Sarah K., after reading this document
✍️ Write Your Haiku

Haikus for Humanity — 5 · 7 · 5

React
Share𝕏🦋FBinFund Accountability