Epstein Index›Documents›EFTA00971727
⚡IMPACT LEVEL 3 — NOTEWORTHY

Epstein File EFTA00971727: Mike Flood, Flood and Bedroom (DS9)

General DocumentDate unavailableEFTA009717272 keyword hits
0
views
0
shares
0
reactions
2
persons
5
keywords
10
excerpts

This document appears to be a technical report about construction or maintenance work, discussing sealed gutters, water testing, and potential water leakage. The text references gutter caps, PVC elbows, and water spray tests on walls, with notes about temporary sealing of an area by a party referred to as '3 B's'.

👤 Named in This Document

📋 Key Excerpts10

PersonKeyword
Excerpt 1
As discussed 3 B's sealed the existing gutter cap water tested leaders, PVC elbow was connected to gutter spout. therefore any backup of water would cause
Excerpt 2
Next step, Leaders where sealed correctly, terrace and gutter flood with water.
Excerpt 3
No leakage from ceiling below When water was spray on wall below windows, leakage occurred from ceiling below 3 B's have Temporarily sealed area, JJ is

Discussion

Let the world know how you feel.

What you just read should make you angry. Channel that into 17 syllables. Our AI helps you craft a haiku in seconds — then share it with the world.

Power hides in dark But sunlight finds every crack Truth cannot be bought

— Sarah K., after reading this document
✍️ Write Your Haiku

Haikus for Humanity — 5 · 7 · 5

React
Share𝕏🦋FBinFund Accountability