Epstein Index›Documents›EFTA01075055
💨IMPACT LEVEL 1 — MEH

Epstein File EFTA01075055: Construction and Submission (DS9)

General DocumentDate unavailableEFTA010750551 keyword hits
0
views
0
shares
0
reactions
0
persons
2
keywords
5
excerpts

This document appears to be a technical or architectural submission involving measured drawings of a 'Tunnel' Building and a Garage Building. A topographic survey by Marvin Berning was included, and a new preliminary building layout was developed for submission.

👤 Named in This Document
No named persons linked yet
🔑 Evidence Keywords

📋 Key Excerpts5

PersonKeyword
Excerpt 1
Included from our first **submission** were Measured Drawings of the "Tunnel" Building and the existing Garage Building.
Excerpt 2
The Topographic Survey of the maintenance yard by Marvin Berning was also included with that **submission**.
Excerpt 3
We developed a new preliminary layout for that building, which is included with this **submission**.

Discussion

Let the world know how you feel.

What you just read should make you angry. Channel that into 17 syllables. Our AI helps you craft a haiku in seconds — then share it with the world.

Power hides in dark But sunlight finds every crack Truth cannot be bought

— Sarah K., after reading this document
✍️ Write Your Haiku

Haikus for Humanity — 5 · 7 · 5

React
Share𝕏🦋FBinFund Accountability